The design, engineering and supply of equipment for the 4-cell concrete cooling tower of Kangan Petrorefinery located in the industrial area of Bandar Kangan with a capacity of 16,000 cubic meters per hour was carried out by the experienced team of Saphyad, relying on 50 years of knowledge and experience (1401-1402). In addition to cooling tower equipment, equipment such as filtration package has also been designed and selected.